DES-6321 Dumps

  Printable PDF

  Unencrypted VCE

EMC DES-6321 dumps - 100% Pass Guarantee!

Rating: 4.9

Vendor: EMC

Certifications: EMC Certifications

Exam Name: Specialist - Implementation Engineer - VxRail Appliance

Exam Code: DES-6321

Total Questions: 196 Q&As ( View Details)

Last Updated: Mar 15, 2025

Note: Product instant download. Please sign in and click My account to download your product.

PDF Only: $49.99 VCE Only: $55.99 PDF + VCE: $65.99

PDF

  • Q&As Identical to the VCE Product
  • Windows, Mac, Linux, Mobile Phone
  • Printable PDF without Watermark
  • Instant Download Access
  • Download Free PDF Demo
  • Includes 365 Days of Free Updates

Why PDF? Learn More

VCE

  • Q&As Identical to the PDF Product
  • Windows Only
  • Simulates a Real Exam Environment
  • Review Test History and Performance
  • Instant Download Access
  • Includes 365 Days of Free Updates

What is VCE? Find Out

EMC DES-6321 Last Month Results

858
Successful Stories of EMC DES-6321 Exam
95.3%
High Score Rate in Actual EMC Exams
92.5%
Same Questions from the Latest Real Exam
  • 95.3% Pass Rate
  • 365 Days Free Update
  • Verified By Professional IT Experts
  • 24/7 Live Support
  • Instant Download PDF&VCE
  • 3 Days Preparation Before Test
  • 18 Years Experience
  • 6000+ IT Exam Dumps
  • 100% Safe Shopping Experience

DES-6321 Q&A's Detail

Exam Code: DES-6321
Total Questions: 196
Single & Multiple Choice 191
Drag Drop 5

DES-6321 Online Practice Questions and Answers

Questions 1

When adding an S Series node to a Gen 2 VxRail 240F cluster the build fails.

What could be a possible cause of this situation?

A. IP Pool has no more free addresses

B. Hybrid and Flash nodes cannot be mixed in the same cluster

C. Quanta and Dell hardware cannot be mixed in the same cluster

D. Loudmouth process needs to be restarted

Show Answer
Questions 2

During a node add procedure the new node cannot be discovered. A ping to the IPv6 address is responding.

What could be the cause of this issue?

A. Only one network interface is up on the new node

B. vSAN VLAN is not configured correctly

C. Management VLAN ID is not set on the vmk0 interface

D. Loudmouth process is not running

Show Answer
Questions 3

The vCenter managing a VxRail cluster must be able to support both Enhanced Linked Mode and vSAN Encryption.

What is the correct configuration to satisfy this requirement?

A. External vCenter External PSC

B. Embedded vCenter Embedded PSC

C. External vCenter Embedded PSC

D. Embedded vCenter External PSC

Show Answer
Questions 4

What is the maximum number of nodes in a VxRail cluster when using 1 GbE links?

A. 4

B. 8

C. 16

D. 32

Show Answer
Questions 5

A VxRail Stretched Cluster will be configured with four All-Flash nodes at each site based on the following requirements:

PFTT = 1 SFTT = 1 FTM = Erasure Coding

Based on the required usable capacity, what should be the planned capacity of the design?

A. Single Site Capacity = 150% Total Cluster Capacity = 300%

B. Single Site Capacity = 133% Total Cluster Capacity = 266%

C. Single Site Capacity = 100% Total Cluster Capacity = 200%

D. Single Site Capacity = 200% Total Cluster Capacity = 400%

Show Answer More Questions

Add Comments

Comment will be moderated and published within 1-4 hours

Success Stories

  • United States
  • donphila
  • Mar 18, 2025
  • Rating: 4.8 / 5.0

The dump is still valid. With this dump only, I passed my exam. Thank you for all comments!


  • Bangladesh
  • Deere
  • Mar 16, 2025
  • Rating: 4.5 / 5.0

Thanks for your help I pass my exam yesterday. Although I did not get a very high score but never mind. Thanks.


  • United Kingdom
  • sipxbpx
  • Mar 16, 2025
  • Rating: 4.2 / 5.0

I'm so happy that I passed the exam this week. Thanks for this study material.