DRAG DROP
Match the management tool that is used to perform the associated operation in a VxRail environment.
Select and Place:
What is the VxRail maximum cluster size if using only 1 GbE links?
A. 8
B. 16
C. 32
D. 64 with an RPQ
A workstation is being configured on the management VLAN (10.150.140.0/24) to connect to VxRail Manager for first time deployment.
Configuring which IP addresses on the workstation will result in a successful deployment without having to change them during initialization?
A. 192.168.1.199 and 10.150.140.100
B. 192.168.1.250 and 10.150.140.255
C. 192.168.10.199 and 10.150.140.255
D. 192.168.10.250 and 10.150.140.250
What is the recommended way to power up VxRail G Series node?
A. Wait at least 30 seconds between powering up each node.
B. Power up nodes in the following sequence: one, two, three, four.
C. Use the BMC interface to power cycle each node
D. Ensure System Health indicator blinks amber for 10 minutes after power on.
When adding a VxRail node the validation fails. What could be the cause of this problem?
A. IPv6 multicasting is not enabled
B. Only one network interface online
C. Time on the node was not set correctly
D. DNS record was not created
A company has a simple, 3 node VxRail cluster. The VxRail is running version 3.5 and utilizes a vSphere Enterprise Plus license. The company has asked for a VxRail software upgrade. What are the steps for the upgrade?
A. Log in to VxRail Manager, select "Internet Upgrade", then follow the prompts.
B. Log in to support.emc.com and download the upgrade packages.Next, open VxRail Manager, select "Off-line Upgrade", then follow the prompts.
C. Contact Dell EMC support to request the upgrade to the VxRail cluster.
D. Placeall four nodes into maintenance mode.Next, log in to VxRail Manager, select "Internet Upgrade", then follow the prompts.
In a 24 node Stretched Cluster VxRail deployment, what is the acceptable Rout Trip Time (RTT) latency between sites?
A. Primary to witness site RTT latency: 10 msSecondary to witness site RTT latency: 10 msPrimary tosecondary site RTT latency: 10 ms
B. Primary to witness site RTT latency: 50 msSecondary to witness site RTT latency: 50 msPrimary to secondary site RTT latency: 6 ms
C. Primary to witness site RTT latency: 75 msSecondary to witness site RTT latency: 75 msPrimary to secondary site RTT latency: 1 ms
D. Primary to witness site RTT latency: 75 msSecondary to witness site RTT latency: 150 msPrimary to secondary site RTT latency: 5 ms
What is the minimum number of VxRail hosts required if FTT = 1 and FTM is set to Erasure Coding?
A. 3
B. 4
C. 5
D. 6
A Dell EMC solutions architect has updated the VxRail PEQ with Customer Top-of-Rack (ToR) switch details. On which worksheet would they need to be to generate a new NVT JSON file?
A. Engagement Details
B. Networking Details
C. Customer
D. VxRail Cluster
In addition to the VxRail YouTube video, links to what resources should the SE send to the customer, according to the VxRail PEQ Engagement Details worksheet?
A. VxRail vCenter Server Planning Guide VxRail Network Guide
B. VxRail QuickStart Guide VxRail Network Guide
C. VxRail vCenter Server Planning Guide Network Validation Tool
D. VxRail QuickStart Guide Network Validation Tool
Which port configuration is invalid on the integrated NIC of a VxRail node?
A. 2 x 25 GbE SFP28
B. 2 x 10 GbE RJ45
C. 2 x 10 GbE SFP+
D. 2 x 1 GbE RJ45
What is the maximum number of nodes in a VxRail Cluster with 25 GbE?
A. 32
B. 64
C. 96
D. 128
A Dell EMC solutions architect has converted the VxRail PEQ to Customer Mode They have engaged with the customer to input information about the VxRail networks, IP address, subnet mask, gateway, and VLAN ID details.
In which section would the customer input this information?
A. System Information
B. Virtual Machines
C. Physical Network
D. ESXi Host Details
requirement must be met when expanding a VxRail G560F 3 node Cluster with a 4ih G Series node in the same chassis?
A. Node must be identical to the other three nodes
B. Node requires only the same drive configuration
C. Node must be a hybrid node
D. Node requires only the same processor type
What VxRail vSAN storage policy should NOT be changed or deleted after the initial setup?
A. vSAN Default Storage Policy
B. VM Encryption Policy
C. VXRA1L-STORAGE-PROFILE
D. VXRAIL-SYSTEM-STORAGE-PROFILE