1Z0-1075-22 Dumps

  Printable PDF

  Unencrypted VCE

Oracle 1Z0-1075-22 dumps - 100% Pass Guarantee!

Rating: 4.6

Vendor: Oracle

Certifications: Oracle Certifications

Exam Name: Oracle Manufacturing Cloud 2022 Implementation Professional

Exam Code: 1Z0-1075-22

Total Questions: 66 Q&As ( View Details)

Last Updated: Mar 15, 2025

Note: Product instant download. Please sign in and click My account to download your product.

PDF Only: $49.99 VCE Only: $55.99 PDF + VCE: $65.99

PDF

  • Q&As Identical to the VCE Product
  • Windows, Mac, Linux, Mobile Phone
  • Printable PDF without Watermark
  • Instant Download Access
  • Download Free PDF Demo
  • Includes 365 Days of Free Updates

Why PDF? Learn More

VCE

  • Q&As Identical to the PDF Product
  • Windows Only
  • Simulates a Real Exam Environment
  • Review Test History and Performance
  • Instant Download Access
  • Includes 365 Days of Free Updates

What is VCE? Find Out

Oracle 1Z0-1075-22 Last Month Results

645
Successful Stories of Oracle 1Z0-1075-22 Exam
98.8%
High Score Rate in Actual Oracle Exams
90.6%
Same Questions from the Latest Real Exam
  • 98.8% Pass Rate
  • 365 Days Free Update
  • Verified By Professional IT Experts
  • 24/7 Live Support
  • Instant Download PDF&VCE
  • 3 Days Preparation Before Test
  • 18 Years Experience
  • 6000+ IT Exam Dumps
  • 100% Safe Shopping Experience

1Z0-1075-22 Q&A's Detail

Exam Code: 1Z0-1075-22
Total Questions: 66
Single & Multiple Choice 66

1Z0-1075-22 Online Practice Questions and Answers

Questions 1

A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day. Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page.

A. Click Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units Availability column.

B. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units in Default Availability column.

C. Click Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource Availability tab>Click Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units Available.

D. Click Outside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability and Overrides Region> Populate 4 units in Availability Override column.

Show Answer
Questions 2

The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, has scheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes. Which two reasons could cause this?

A. The engineer does not have Data access to Items Attributes.

B. The engineer does not have Data access to Items.

C. The engineer does not have Data access to Manufacturing plant in which the Item Structure change was performed.

D. The engineer does not have Data access to Item Structures.

E. The engineer does not have the Manage Work Definitions function privilege.

Show Answer
Questions 3

Identify three requirements fulfilled by nonstandard work orders.

A. Rescheduling

B. Repair

C. Rework

D. Prototype

Show Answer
Questions 4

The Cost Accountant has reported to the Production Supervisor that the Work Order transactions are not

getting transferred to Costing.

Identify the reason for work order transactions not getting transferred to Costing.

A. The Manage Item Rules setup is not complete.

B. The Costing Interfaced Attribute is enabled in the resource definition.

C. The item was made inactive after the Work Order transaction.

D. The Costing Interfaced Attribute is not enabled in the resource definition.

Show Answer
Questions 5

One of the key execution capabilities that Oracle Manufacturing Cloud offers is that you can generate and

manage work order exceptions.

Which option shows the production exception types that can be reported by the production operator?

A. Work Area, Work Center, and Resources

B. Work Center and Resources

C. Resources and Components

D. Work Area, Work Center, Resources, and Components

E. Work Area, Work Center, Resources, Components, and Miscellaneous

Show Answer More Questions

Add Comments

Comment will be moderated and published within 1-4 hours

Success Stories

  • Greece
  • Cadman
  • Mar 20, 2025
  • Rating: 4.7 / 5.0

I'm feeling luck because there are no new questions! All the questions are form this dumps!!! Thanks for your help! Thank you all !!!


  • Singapore
  • Teressa
  • Mar 19, 2025
  • Rating: 4.2 / 5.0

Wonderful dumps. I really appreciated this dumps with so many new questions and update so quickly. Recommend strongly.


  • Mongolia
  • Sam
  • Mar 18, 2025
  • Rating: 4.3 / 5.0

Today i passed the exam, This dumps is valid exactly. Please read all of theory and then use this dumps.


  • South Africa
  • Levi
  • Mar 17, 2025
  • Rating: 4.3 / 5.0

I only used this dumps and my book. I passed the exam with high score surprisingly. Really thanks for this valid dumps.


  • India
  • zuher
  • Mar 15, 2025
  • Rating: 4.7 / 5.0

thanks for the advice. I passed my exam today! All the questions are from your dumps. Great job.


  • Morocco
  • souam
  • Mar 15, 2025
  • Rating: 4.9 / 5.0

There are many new questions in the dumps and the answers are accurate and correct. I finished my exam with high score this morning, thanks very much.


  • India
  • Jo
  • Mar 14, 2025
  • Rating: 5.0 / 5.0

hi guys this dumps is enough to pass the exam because i have passed the exam just with the help of this dumps, so you can do it.


  • Greece
  • Ramon
  • Mar 14, 2025
  • Rating: 4.9 / 5.0

The answers are accurate. Well you should notice some of the questions are slightly changed. Be careful.


  • Pakistan
  • zia
  • Mar 13, 2025
  • Rating: 4.1 / 5.0

I took my exam yesterday and passed. Questions are valid. Customer support was great. Thanks for your help.


  • Mexico
  • Igor
  • Mar 13, 2025
  • Rating: 4.6 / 5.0

Still valid, passed 976!