An administrator is working on a one-node ROBO cluster configuration. Which statement is true for this configuration?
A. CVM should be assigned 8 vCPUs and 20 GB memory
B. Supported hardware is NX-1175S-G5 and NX-1175S-G6
C. The minimum RPO for this from factor is 8 hours
D. A Witness VM is required to break the quorum
Refer to the exhibit.
An administrator logs in to Prism Element, goes to the Network view, and sees the output shown in the exhibit. Which three steps must the administrator take to increase throughput to the host? (Choose three.)
A. Change the VLAN ID to a higher priority ID
B. Connect the 10Gb interfaces to the physical switch
C. Remove any 1Gb interfaces still connected from the default bond
D. Change the bond mode to balance-slb or balance-tcp
E. Add a new switch to the network and connect 1Gb interfaces to it
Refer to the exhibit.
A two-node ROBO cluster is configured with a witness VM. What happens when Node A goes down?
A. All operations and services on the Node B are shut down and go into a waiting state
B. Node B sends a leadership request to the Witness VM and goes into single-node mode
C. The cluster is unaffected and no administrator intervention is required
D. The cluster becomes unavailable and goes into read-only mode
A Nutanix administrator needs to replace a self-signed SSL certificate with a CA generated certificate in Prism. Which three files are required to install the CA generated certificate in Prism? (Choose three.)
A. Private Server Key (private_server.key)
B. Public Certificate (PublicCert.ker)
C. Certificate Signing Request (server.csr)
D. Public Server Key (public_server.key)
E. CA Certificate or Chain (ca_chain_certs.cer)
The customer is seeing high memory utilization on a mission critical VM. Users report that the application is unavailable. The guest OS does not support hot add components.
How should the administrator fix this issue?
A. Go to Control Panel in the VM: Select the Computer Properties Increase the amount of RAM assigned
B. From the Prism web console: Go to the VM dashboard Select the VM from the VMs list Choose Update Adjust the amount of memory assigned to the VM
C. During the next maintenance window: Select the VM from the VMs list Perform a graceful shutdown Choose Update Increase the amount of memory assigned to the VM
D. Access the CVM on the host that is running the VM: Open acli Run a command to increase the amount of RAM assigned to the VM
What is the expected operation during node addition when the new node has a different AOS version?
A. The node is automatically re-imaged using the software currently running in the cluster
B. The node is added and a separate upgrade operation must be performed
C. The entire cluster is upgraded to the latest one-click release
D. The addition fails and forces the administrator to image using standalone Foundation
A customer has a newly-deployed AHV cluster with nodes that have 2 x 10GbE and 2 x 1GbE interfaces. The customer wants to use all available network interfaces to provide connectivity to the VMs. Which option should the administrator use to achieve this while remaining consistent with Nutanix recommendations?
A. Create bond1 on virbr0 and add the 1GbE interfaces to it for VM use
B. Create a second bridge on each host and assign the 1GbE interfaces to it
C. Create a second bond on br0 on each host and assign the 1GbE interfaces to it
D. Create separate VLANs that map 10GbE and 1GbE interfaces
What is the maximum number of VMs that can be supported by a Scale-Out Prism Central Instance?
A. 5,000
B. 12,500
C. 25,000
D. 50,000
What command places a host in maintenance mode in AHV?
A. acli maintenance_mode.host host_id
B. ncli host maintenance host_id
C. ncli maintenance_mode host=host_id
D. acli host.enter_maintenance_mode host_id
Which is true for PD Activate and Migrate options? (Choose two.)
A. Activate is initiated from the source site
B. Activate is initiated from the destination site
C. Migrate is initiated from the destination site
D. Migrate is initiated from the source site
An administrator needs to manage VMs from Prism when the cluster is running on ESXi. The VM management options in Prism are grayed out and unavailable. Which procedure should the administrator complete to manage VMs from Prism when using the ESXi hypervisor?
A. VCenter must be registered in Prism.
B. Prism does not support managing VMs on ESXi.
C. Administrator must upgrade Prism license
D. Only Prism Central can manage VMs for ESXi Clusters.
An administrator needs to modify the configuration of a recently deployed Acropolis File Service (AFS) instance.
Which two are valid configuration settings under the File Service update option? (Choose two.)
A. File Server VM configuration
B. File Server block size
C. File Server OS type
D. Number of File Server VMs
E. File server data replication
An administrator is creating a new Windows VM in AHV after migrating its data from ESXi.
Which two parameters should be set identically to the VM settings in ESXi? (Choose two.)
A. Screen resolution
B. Host Affinity
C. vCPU core
D. memory
E. VLAN IDs
The Linux administrator team has requested access rights to any current or future Linux VM in the environment.
What entity should be selected when assigning this new role?
A. Image
B. AHV Cluster
C. Category
D. Project
Which component ensures uniform distribution of data throughout the cluster to eliminate hot spots and speed up rebuilds?
A. Cassandra
B. Distributed Storage Fabric
C. High Availability
D. Acropolis App Mobility Fabric