Certbus > Hitachi > Hitachi Certifications > HQT-4120 > HQT-4120 Online Practice Questions and Answers

HQT-4120 Online Practice Questions and Answers

Questions 4

What are two requirements forSVP connectivity on the VSP Gx00series? (Choose two.) Choose 2 answers

A. One Ethernet connection to the customer's network.

B. At least one 1000BASE-SX optical connection to the customer's network.

C. One iSCSI connection from each controller to separate LAN ports on the SVP.

D. A static IP address for the SVP that is on the same network segment as the storage system.

Browse 35 Q&As
Questions 5

What are two supported back-end transfer speeds on the VSP Gx00 series? (Choose two.) Choose 2 answers

A. 4 Gb/S

B. 6 Gb/s

C. 8 Gb/s

D. 12 Gb/s

Browse 35 Q&As
Questions 6

Which two actions can be performed with the Block Element Manager (BEM) on the VSP Gx00 series? (Choose two.)

A. Generate a configuration report.

B. Configure the SVP.

C. Generate license keys.

D. Set front-end port parameters.

Browse 35 Q&As
Questions 7

Which two messaging methods can be enabled In the Maintenance Utility of the VSP Gx00series? (Choose two.)

A. SMS

B. Email

C. SNMP

D. Hi-Track

Browse 35 Q&As
Questions 8

You are installing a VSP G400 at a customer site.

Which three items get configured when you launch the Initial Setup Tool? (Choose three.)

A. License

B. Hi-Track

C. Date and time

D. FC port topology

E. System information

Browse 35 Q&As
Questions 9

Which two reconfiguration activities are performed without interrupting host access on a VSP Gx00 system? (Choose two.)

A. adding a DKB

B. adding a DB60 drive tray

C. upgrading from G200 to G800

D. upgrading from G200 to G600

Browse 35 Q&As
Questions 10

What are two prerequisites for the Initial Installation of a VSP G400? (Choose two.)

A. The SVP must be connected to the customer network.

B. The controllers must be assembled and cabled to the SVP.

C. Microsoft Vista must be installed on the Maintenance PC (MPC).

D. The microcode media (CDROM or ISO image) must be available.

Browse 35 Q&As
Questions 11

From which two locations can the Maintenance Utility be Invoked on a VSP G800? (Choose two.)

A. the SVP Web Console

B. Hitachi Command Suite (HCS)

C. Hitachi Infrastructure Director (HID)

D. MPC connected to the Maintenance LAN port on the array

Browse 35 Q&As
Questions 12

Which program is used to perform the "New Installation" procedure on a VSP Gx00 system?

A. HID

B. MPC

C. GUM

D. BECK

Browse 35 Q&As
Questions 13

Which two parts replacement methods are supported in the VSP Gx00series? (Choose two.)

A. local

B. direct

C. remote

D. indirect

Browse 35 Q&As
Questions 14

What is a prerequisite for using RAID Manager/CCI CLI?

A. a license key

B. a system disk

C. a Journal volume

D. a Command Device

Browse 35 Q&As
Questions 15

Which component in the VSP Gx00 series provides the CFM and the cache with power In case of power outage?

A. Backup Module

B. Battery Module

C. Cache Module

D. Power Module

Browse 35 Q&As
Questions 16

What does Universal Volume Manager (UVM) allow on the VSP Gx00 systems?

A. to create virtual servers

B. to use MPs on the attached disk storage

C. to create LUNs on the attached disk storage

D. to map disk space from the attached disk storage

Browse 35 Q&As
Questions 17

Which function is available in Hitachi Infrastructure Director (HID)?

A. Global Active Device setup

B. configuration of HDLM load balancing

C. basic provisioning of a VSP Gx00 system

D. automated provisioning for multiple VSP Gx00 systems

Browse 35 Q&As
Questions 18

Which two Channel Blade types are supported on the VSP Gx00series? (Choose two.)

A. FC

B. SAS

C. iSCSI

D. FICON

Browse 35 Q&As
Exam Code: HQT-4120
Exam Name: Hitachi Vantara Qualified Professional VSP G200 to VSP G800 Storage Installation
Last Update: Mar 18, 2025
Questions: 35 Q&As

PDF

$49.99

VCE

$55.99

PDF + VCE

$65.99