Certbus > HP > HP Certifications > HPE0-S58 > HPE0-S58 Online Practice Questions and Answers

HPE0-S58 Online Practice Questions and Answers

Questions 4

HOTSPOT

An integrator needs to re-deploy a specific firmware component to one of the Synergy compute nodes.

Click on the option that will allow an integrator to rewrite existing firmware components with the same option.

Hot Area:

Browse 97 Q&As
Questions 5

An integrator is installing three Synergy frames in different locations for a customer. As part of the installation, the customer requests a single monitoring dashboard that shows the current hardware status, warranty status, and open support cases of all three frames.

Which configuration steps must the integrator perform to provide the customer with this functionality?

A. Enable Remote Support and Insight Online Integration in the Composer UI

B. Install Insight Remote Support Advanced, and integrate it with HPE Global Dashboard

C. Configure OneView with iLO Amplifier pack

D. Activate iLO Federation on all installed compute nodes

Browse 97 Q&As
Questions 6

Which operating systems are supported for use with Image Streamer? (Choose two.)

A. VMware ESXi 6.7

B. CentOS 7.2

C. SUSE Linux Enterprise Server 11

D. Windows Hyper-V 2019

E. Red Hat Enterprise Linux 7.3

Browse 97 Q&As
Questions 7

An HPE Synergy compute module has a template-based server profile with two identically configured connections, each containing five VLANs. What is the most efficient method the integrator can use to add a new VLAN to each connection?

A. Add the new VLAN to the network set configured in the profile template, and update the server profile from the template

B. Add the new VLAN under Edit server profile connections

C. Add the new VLAN to the network set configured in the profile template

D. Add the new VLAN under Edit server profile connections in the profile template, and update the server profile from the template

Browse 97 Q&As
Questions 8

A customer has a datacenter with 3-frame Master/Satellite Synergy solution. They plan to add two additional frames to the remote datacenter, but they want to have a single management tool. How should the integrator set up the management of the datacenter?

A. Add two frames from the remote datacenter as remote enclosures using existing Composer

B. Install one Composer in every frame in both local and remote datacenter

C. Deploy one Composer in each site and link them together

D. Connect the management links with fibre cables if the distance between datacenters is more than 500m

Browse 97 Q&As
Questions 9

A customer needs to expand a single-frame Synergy solution to two frames.

What should the integrator do to establish a proper management network for the two frames?

A. Connect the RJ-45 management ports of the Virtual Connect modules together with redundant CAT6A cables.

B. Disconnect the existing management ring, and cable the Frame Link Modules in the first frame to the Frame Link Modules in the added frame.

C. Connect the RJ-45 front panel connectors on the two frames together with a single CAT6A cable.

D. In the Synergy console, select the Frame Link Modules in the new frame and define the connection between them.

Browse 97 Q&As
Questions 10

A customer wants to expand their existing cluster using the Grow Cluster functionality from OneView for vCenter Server. Which OS build plan managed by HPE OneView for vCenter Server can the customer use?

A. ICsp-Based Deployment

B. iLO Federation-Based Deployment

C. Image Streamer-Based Deployment

D. PXE-Based Deployment

Browse 97 Q&As
Questions 11

Using a two-port FLM, what is the minimum number of frames needed to implement a solution that includes redundant Composers and Image Streamers?

A. 1

B. 2

C. 3

D. 4

Browse 97 Q&As
Questions 12

Refer to the exhibit.

A Synergy integrator needs to establish the module cluster links between two master modules, as shown. Which ports can the integrator use for the module cluster links?

A. 1 and 2

B. 3 and 4

C. 5 and 6

D. 7 and 8

Browse 97 Q&As
Questions 13

A customer needs a Synergy solution to meet the following requirements: Acts as a master module in a multiple frame logical fabric Provides advanced Ethernet switching features Managed by the network team Supports 10Gb downlinks to compute modules 40Gb uplinks to core switches

Which interconnect module should the integrator use?

A. Mellanox SH2200 Switch Module

B. HPE Synergy 10Gb/40Gb Pass-Thru Modules

C. HPE Synergy 40Gb F8 Switch Module

D. HPE Virtual Connect SE 40Gb F8 module for HPE Synergy

Browse 97 Q&As
Questions 14

A customer is expanding its Synergy environment from one rack with a 3-frame master/satellite configuration to five racks (15 Synergy Frames) with identical hardware configurations. What must the integrator do to perform this Synergy expansion?

A. Create new Logical Enclosure (LE), Logical Enclosure Group (LIG), and Enclosure Group (EG) for each rack

B. Create a new Logical Enclosure (LE) for each rack using existing templates

C. Re-home the Logical Enclosure (LE) using the edited Enclosure Group (EG) and Logical Interconnect Group (LIG)

D. Perform hardware discovery from the console, and copy the Logical Enclosure (LE)

Browse 97 Q&As
Questions 15

An integrator needs to add a new network connection to the existing profile associated with a database compute node. The customer is concerned about the impact of this change to the compute node and application. How should the integrator respond?

A. Adding a new connection can be done only when server is powered off

B. Adding a new connection can be done only by the user with the server profile architect permissions

C. Adding a new connection requires the server profile to be re-created

D. Adding this connection can be done online, so it will have no impact on the server

Browse 97 Q&As
Questions 16

A customer needs to deploy HPE Global Dashboard appliance, but experienced vCenter Server failure and cannot access ESXi servers. How can the customer connect to the specific ESXi server to power on important virtual machines?

A. Login directly to the ESXi system using an embedded Host Client

B. Use HPE Composer to restart key vCenter Server services remotely

C. Login to the vCenter Server on port 5480, which is used for backup vCenter Server and is deployed automatically

D. Login to the Web Client, which is independent from the vCenter Server and provides basic management features

Browse 97 Q&As
Questions 17

Using a laptop, how can an integrator perform the initial setup on an HPE Synergy 12000 Frame?

A. Connect a CAT5 cable to the MGMT port of the top Frame Link Module, and connect to the HPE Synergy console with VNC to the address 306.025 port 5900.

B. Connect a CAT5 cable to the front panel module, use the HPE Synergy default IP address of 192.168.10.1, port 5900, and connect to the HPE Synergy console with a web browser.

C. Connect a CAT5 cable to the MGMT port of the top Frame Link Module, and connect to the HPE Synergy console with a web browser to the address 192.168.10.1, port 5900.

D. Connect a CAT5 cable to the front panel module, use the HPE Synergy default IP address of 192.168.10.1, port 5900, and connect to the HPE Synergy console with VNC.

Browse 97 Q&As
Questions 18

An integrator has planned a highly available Synergy Composable Fabric with 20Gb Interconnect Link Modules. What is the maximum number of SY 480 Gen10 compute modules the integrator can install into this configuration?

A. 24

B. 36

C. 48

D. 60

Browse 97 Q&As
Exam Code: HPE0-S58
Exam Name: Implementing HPE Composable Infrastructure Solutions
Last Update: Mar 19, 2025
Questions: 97 Q&As

PDF

$49.99

VCE

$55.99

PDF + VCE

$65.99