During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:
A. It performs a comparison on selected tables using check sum.
B. It performs a comparison on all tables using row counts.
C. It performs a comparison of all tables using check sum.
D. It does NOT perform any table comparison.
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:
A. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
B. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
C. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
D. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
A. Upgrading to SAP ECC 6.08 without using DMO
B. Using DMO when applying Support Packages to SAP ECC 6.07
C. SAP S/4HANA conversion to SAP S/4HANA 1709
D. Updating to SAP ECC 6.07 using DMO
In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.
A. When performing an SAP S/4HANA conversion with DMO
B. When performing an SAP S/4HANA conversion without u DMO
C. When upgrading an SAP S/4HANA Server system
D. When upgrading an SAP ECC system with DMO
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?
A. 750
B. 700
C. 731
D. 740
Which additional configuration options are offered by SUM when selecting "Switch expert mode on" in main configuration option "Standard"?
There are 2 correct answers to this question.
Response:
A. Keep archiving on during the whole procedure.
B. Use the Near Zero Downtime Maintenance Technology (NZDM).
C. Reuse a profile for the shadow instance from a previous run.
D. Choose the instance number of the shadow instance.
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
There are 2 correct answers to this question.
Response:
A. Create "modified* versions of the objects that you need to adjust
B. Release the transport request containing the modification adjustment
C. Assign the transport request as a modification adjustment transport
D. Manually activate the adjusted dictionary objects
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:
A. It contains a troubleshooting section
B. It is target release specific
C. It contains a section "free space requirements"
D. It is a database-specific document
You are starting an SAP S/4HANA Conversion. The scenario strategy Downtime Optimized Conversion (DoC) is NOT selectable. What could be the reason?
A. The SAP S/4HANA Conversion is without DMO.
B. The SAP S/4HANA Conversion includes a DMO.
C. The start release is too old for DOC.
D. The source database is not supported
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:
A. Run the database migration to the SAP HANA database
B. Perform the migration of data into the new data structure
C. Check the compatibility of custom code with SAP S/4HANA
D. Apply the recommendations of the simplification list
In ICNV. How database operations synchronized between the source and the target table?
A. Deletes are directly executed in the target table by delete trigger.
B. AA
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:
A. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
B. Import of upgrade and language data from the download directory in phase TABIM UPG
C. Activation of dictionary objects in phase ACT_UPG
D. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
E. Import of dictionary objects from the download directory in phase DDIC_UPG
You have chosen the "Advanced" option during the main configuration of the SUM tool. Which steps take place via the shadow instance?
There are 2 correct answers to this question.
Response:
A. Conversion of application tables (PARCONV_UPG)
B. Activation of dictionary objects (ACT_UPG)
C. Switch to new repository (EU_SWITCH)
D. Modification adjustment (SPDD)
You are running an SAP ECC system.
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities?
Note There are 3 correct answers to this question
A. Upgrade the SAP system
B. Perform an SAP S/4 HANA conversion without DMO
C. Perform an SAP S/4 HANA conversion including DMO
D. Apply SAP support packages
E. Use DMO for SUM
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
A. EU_IMPORT_ALL
B. EU_CLONE_MIG_DT_CREATE
C. EU_CLONE_MIG_SOT_RUN
D. EU_CLONE_MIG_DT_RUN