Certbus > SAP > SAP Certifications > E_S4HCON2022 > E_S4HCON2022 Online Practice Questions and Answers

E_S4HCON2022 Online Practice Questions and Answers

Questions 4

You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?

There are 2 correct answers to this question.

A. Kernel for target release, Windows, SAP MaxDB

B. Kernel for target release, Linux, SAP HANA

C. Kernel for target release, Windows, SAP HANA

D. Kernel for source release, Windows, SAP MaxDB

Browse 71 Q&As
Questions 5

You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

A. The source system is non-Unicode and the target database is a scale-out system.

B. The target database size increases temporarily because of the Shadow Repository.

C. SAP HANA Landscape Reorganization required a manual step to edit a file.

D. Network capacity between exporting and importing R3load processes must be.

E. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.

Browse 71 Q&As
Questions 6

You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

A. After SUM has ended

B. During the Execution roadmap step

C. Before the start of the SUM technical downtime

D. During the SUM technical downtime

Browse 71 Q&As
Questions 7

What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?

Please choose the correct answer.

Response:

A. An upgrade of the software components is performed, without changing the database type.

B. A change of the database type is performed, without changing the software components.

C. An SAP S/4HANA conversion is performed, without adapting the customer data.

D. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.

Browse 71 Q&As
Questions 8

You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?

A. The start of the Execution roadmap step

B. The start of the business downtime

C. The end of the business downtime

D. The end of the database migration

Browse 71 Q&As
Questions 9

What is the benefit of using the file UPGANA.XML from a previous SUM run? Please choose the correct answer. Response:

A. To auto-fill specific fields on selected screens on the SUM UI

B. To make the progress information within SUM UI more accurate

C. To repeat specific phases during the SUM run

D. To skip selected phases during the SUM run

Browse 71 Q&As
Questions 10

You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?

There are 2 correct answers to this question.

Response:

A. Run the database migration to the SAP HANA database

B. Perform the migration of data into the new data structure

C. Check the compatibility of custom code with SAP S/4HANA

D. Apply the recommendations of the simplification list

Browse 71 Q&As
Questions 11

You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?

A. EU_IMPORT_ALL

B. EU_CLONE_MIG_DT_CREATE

C. EU_CLONE_MIG_SOT_RUN

D. EU_CLONE_MIG_DT_RUN

Browse 71 Q&As
Questions 12

During the upgrade of your development system, you run into the adjustment of non- dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?

A. SUM continues with the next phase and your modifications are kept as In the start release

B. SUM continues with the next phase and your modifications are lost

C. Before continuing with the next phase SUM asks for a modification adjustment transport

D. SUM refuses to continue unless you have marked a transport request as modification adjustment transport

Browse 71 Q&As
Questions 13

During a DMO procedure with SUM, after which phase is the repository first available on the target database?

Please choose the correct answer.

Response:

A. Uptime migration (EU_CLONE_MIG_UT_RUN)

B. ParaUel distribution (PARDIST_SHD)

C. Downtime migration (EU_CLONE_MIG_DT_RUN)

D. Shadow repository creation (EU_IMPORT*)

Browse 71 Q&As
Questions 14

What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?

There are 3 correct answers to this question.

Response:

A. Phases DIFF*

B. Phase DOWNCONF_DTTRANS

C. Phase RUN_RSPTBFIL _ISUTABU

D. Phases EU_IMPORT*

E. Phase RUN_RSDBSCPY

Browse 71 Q&As
Questions 15

You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?

Please choose the correct answer.

Response:

A. An additional temporary database is used during uptime

B. Dedicated application tables are migrated in uptime

C. TABIMJJPG is executed in uptime

D. The repository is migrated in uptime

Browse 71 Q&As
Questions 16

What do you do to prepare the database migration option of a SUM procedure?

There are 3 correct answers

Response:

A. Extract the SAP HANA database installation archive

B. Move the stack.xml update file into the download folder

C. Extract the SAP HANA client installation archive

D. Move the SAPM update archive into the download folder

E. Move the R3trans update archive into the download folder

Browse 71 Q&As
Questions 17

Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

A. The link to different patch levels to SUM

B. The corrections to the SUM Guide

C. An overview about possible upgrade paths

Browse 71 Q&As
Questions 18

You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?

Please choose the correct answer.

Response:

A. /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)

B. /ASU/SSM (ASU Simple Schedule Manager)

C. /ASU/SHOW_NOTE (Show SAP Note via Web-Browser)

D. /ASU/START (Start ASU Toolbox)

Browse 71 Q&As
Exam Code: E_S4HCON2022
Exam Name: SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade
Last Update: Mar 14, 2025
Questions: 71 Q&As

PDF

$49.99

VCE

$55.99

PDF + VCE

$65.99