Vendor: EMC
Certifications: Implementation Engineer
Exam Name: VNX Solutions Expert Exam for Implementation Engineers
Exam Code: E20-885
Total Questions: 275 Q&As
Last Updated: Mar 19, 2025
Note: Product instant download. Please sign in and click My account to download your product.
VCE
EMC E20-885 Last Month Results
E20-885 Q&A's Detail
Exam Code: | E20-885 |
Total Questions: | 275 |
CertBus Has the Latest E20-885 Exam Dumps in Both PDF and VCE Format
E20-885 Online Practice Questions and Answers
A customer is implementing a DR solution for their CIFS file systems in an EMC VNX for File environment. The customer must ensure all configuration settings are available on the secondary site, in case of a disaster. Which VNX features need to be configured to meet the customer's DR requirements?
A. CIFS, Usermapper and Replicator
B. CIFS, VDMs and Replicator
C. VDMs, Replicator and CAVA
D. CIFS, CAVA and Replicator
Refer to the exhibit.
During an Incremental SAN Copy bulk copy session, on the Source LUN, data blocks A, B, C, and D are all transferred to the Destination LUN. Before data block E can be sent to the Destination LUN, data blocks B and E are updated and become data blocks B` and E`.
What data will be shown in the Transfer DeltaMap, Tracking DeltaMap, and Destination LUN once the start copy session is complete?
A. Transfer DeltaMap: 0 Tracking DeltaMap: 1 Destination LUN: E
B. Transfer DeltaMap: 0 Tracking DeltaMap: 0 Destination LUN: E`
C. Transfer DeltaMap: 1 Tracking DeltaMap: 1 Destination LUN: E
D. Transfer DeltaMap: 0 Tracking DeltaMap: 1 Destination LUN: E`
A customer uses VNX Snapshot for quality assurance testing throughout many phases of development. The customer notices that when project development ends and they delete all the snapshots, SP utilization seems to increase for a long time.
What could they have done to prevent the performance degradation?
A. Keep at least one snapshot of the thick LUN.
B. Unmount the Primary LUN before deleting the snapshots.
C. Defragment the LUN after removing all the snapshots.
D. Rename the snapshots prior to deleting them.
What do primary and standby Control Stations use to monitor each other?
A. nasmcd
B. shared quorum disk
C. nbsnas
D. nasdb
Refer to the exhibit.
You are deploying an EMC RecoverPoint/SE.
Which callout in the exhibit corresponds to the RecoverPoint Appliance (RPA) WAN port?
A. A
B. B
C. C
D. D
Add Comments
Nice study material, I passed the exam with the help of it. Recommend strongly.
Thanks for your help. I passed my exam yesterday with a high score. I think you have the great dumps. all my questions are from your materials. I'm very happy with that. Thanks.
i'm so happy that i passed the exam with full score, thanks for this dumps, thanks all.
Today i pass the exam successfully .Thanks for this dumps. Recommend.
hi guys this dumps is enough to pass the exam because i have passed the exam just with the help of this dumps, so you can do it.
This dumps was introduced by my good friend several month ago. At first, I don't think it will help me a lot. But when I found many new questions that I never found from other study materials, i begun to pay more attention on this dumps. At last, I only used this dumps for preparing my exam. A moment ago, i have cleared that i passed the exam with almost full score. Thanks for this dumps, i will recommend to others just as my friend do.
very good study material.
Hello, guys. i have passed the exam successfully in the morning,thanks you very much.
This dumps is very valid, and i have passed the exam perfectly. Thanks very much, I will continue using it.