Which of the following features are offered by MRP areas in SAP ECC? (Choose two)
A. A storage location may be assigned to different MRP areas.
B. An MRP area may include different storage locations.
C. Make-to-order production is supported by storage location MRP areas.
D. Subcontracting is supported by MRP areas.
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC? (Choose two)
A. Use strategy 50 (planning without final assembly) for the finished product and no strategy for all assemblies in the bill of material.
B. Use strategy 30 (production by lots) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
C. Use strategy 20 (make-to-order production) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
D. Use strategy 40 (planning with final assembly) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
Where can you define the valid receivers for production order costs?
A. In the costing variant
B. In the settlement profile
C. In the valuation variant
D. In the production scheduling profile
Which of the following elements can be used in a process order? (Choose three)
A. Process instructions
B. Parallel sequences
C. Relationships
D. Suboperations
E. Phases
Which of the following items of master data are needed for repetitive manufacturing? (Choose three)
A. Production supply area
B. Repetitive manufacturing profile
C. Production version
D. Master record for serial numbers
E. Product cost collector
Which of the following functions does SAP Supply Chain Management (SCM) offer?
A. Product development, safety, quality, and maintenance
B. Planning of supply chains across company boundaries
C. Communication with customers through different interaction channels
D. Optimization of the procurement strategy with the supplier pool
Which of the following are properties of ECC Multi-Site Planning? (Choose two.)
A. Both withdrawal from alternative plant and withdrawal from another plant are defined via special procurement keys.
B. The use of scope of planning (cross-plant total planning) is mandatory for Multi-Site Planning.
C. When using one-step stock transfer posting, transfer stock is created in the receiving plant.
D. When using two-step stock transport order with delivery, the receiving plant is defined as a customer.
The final assembly of a finished product should only be triggered when a customer order arrives.
Which planning strategy for the finished product do you use?
A. Planning with make-to-stock (strategy 10)
B. Planning at the assembly level (strategy 70)
C. Planning without final assembly (strategy 50)
D. Planning with final assembly (strategy 40)