Response:

A. The functional location type

B. The number of characters for each hierarchy level

C. The edit mask

D. The functional location category

E. The number of hierarchy levels for a particular structure

Browse 184 Q&As
Questions 5

Your customer wants to subdMde the maintenance organization by production responsibility. What do you

use to designate the contact person for coordination between production and plant maintenance? Please

choose the correct answer.

Response:

A. Plant section

B. Production cost center

C. Work center

D. Controlling area

Browse 184 Q&As
Questions 6

Your customer wants to assign personnel to order operations. Which master data must exist in the

system?

Please choose the correct answer.

Response:

A. A requirements profile

B. A personnel indicator in the control key

C. A personnel profile

D. A personnel number

Browse 184 Q&As
Questions 7

Which of the following are prerequisites for business completion? (Choose two)

A. The order must have actual costs.

B. The order must be fully settled.

C. The balance of the order must be zero.

D. The order must have planned costs.

Browse 184 Q&As
Questions 8

When the user creates a maintenance plan for a call object (order), which value in the planning data determines the order type?

A. Priority

B. Maintenance actMty type

C. Maintenance planner group

D. Main work center

Browse 184 Q&As
Questions 9

How many time-based cycles can you use in a multiple-counter maintenance plan?

A. Three

B. Zero

C. Two

D. One

Browse 184 Q&As
Questions 10

What are the purposes of technical object structures? (Choose three)

A. To support Asset Accounting in the description of fixed assets

B. To display the total number of an asset's individual parts from a design engineering perspective

C. To identify objects and object parts for maintenance

D. To collect historical data for maintenance objects

E. To enable detailed cost analyses

Browse 184 Q&As
Questions 11

Which of the following steps are required to create a measuring point for performance-based preventive maintenance? (Choose two)

A. Specify the annual estimated usage for the measuring point.

B. Activate the Nleasurement Reading Transfer indicator.

C. Define a valuation code group.

D. Create the measuring point as a counter.

Browse 184 Q&As
Questions 12

In Customizing, to what data must you assign digital signatures in addition to the order type?

A. Maintenance plant

B. Work center

C. Maintenance planner group

D. Planning plant

Browse 184 Q&As
Questions 13

Your customer wants to utilize estimated costs in Plant Maintenance orders. Which condition does the customer need to be aware of?

A. Planned costs overwrite estimated costs after release of the order.

B. A specific order type in which cost estimates are activated must be used.

C. Planned costs must not exceed the estimated costs.

D. Upon release of the order, estimated costs cannot be revised.

Browse 184 Q&As
Questions 14

When is the latest possible point in time that you can create a settlement rule?

A. Before technical completion

B. Before order release

C. After order release

D. After technical completion

Browse 184 Q&As
Questions 15

Which steps must you perform to enable the valuation of characteristics for a piece of equipment? (Choose three)

A. Assign characteristics to the equipment class type.

B. Assign characteristics to a class.

C. Create characteristics in the classification system.

D. Assign a class to a piece of equipment.

E. Assign a class to the equipment category.

Browse 184 Q&As
Questions 16

You want to record changes to equipment master data fields in the usage history. For which of the following objects can you activate the usage history? Please choose the correct answer. Response:

A. Equipment class

B. Equipment category

C. Object type

D. Planning plant

Browse 184 Q&As
Questions 17

Response:

A. To uniquely identify inventory material items

B. To have a future option to track material items as pieces of functional locations

C. To have a future option to track material items as pieces of equipment

D. To have the option to track batches

Browse 184 Q&As
Questions 18

Which statements apply to a client in an SAP system?

Choose the correct answer(s).

Response:

A. In business terms, the client is a completely independent unit.

B. Each client has their own database.

C. A client corresponds to a customer.

D. A client can represent the mapping for an entire enterprise.

Browse 184 Q&As
Exam Code: C_TPLM30_67
Exam Name: SAP Certified Application Associate - Enterprise Asset Management (Maintenance & Repair) with SAP ERP 6.07
Last Update: Mar 16, 2025
Questions: 184 Q&As

PDF

$49.99

VCE

$55.99

PDF + VCE

$65.99