Response:
A. The functional location type
B. The number of characters for each hierarchy level
C. The edit mask
D. The functional location category
E. The number of hierarchy levels for a particular structure
Your customer wants to subdMde the maintenance organization by production responsibility. What do you
use to designate the contact person for coordination between production and plant maintenance? Please
choose the correct answer.
Response:
A. Plant section
B. Production cost center
C. Work center
D. Controlling area
Your customer wants to assign personnel to order operations. Which master data must exist in the
system?
Please choose the correct answer.
Response:
A. A requirements profile
B. A personnel indicator in the control key
C. A personnel profile
D. A personnel number
Which of the following are prerequisites for business completion? (Choose two)
A. The order must have actual costs.
B. The order must be fully settled.
C. The balance of the order must be zero.
D. The order must have planned costs.
When the user creates a maintenance plan for a call object (order), which value in the planning data determines the order type?
A. Priority
B. Maintenance actMty type
C. Maintenance planner group
D. Main work center
How many time-based cycles can you use in a multiple-counter maintenance plan?
A. Three
B. Zero
C. Two
D. One
What are the purposes of technical object structures? (Choose three)
A. To support Asset Accounting in the description of fixed assets
B. To display the total number of an asset's individual parts from a design engineering perspective
C. To identify objects and object parts for maintenance
D. To collect historical data for maintenance objects
E. To enable detailed cost analyses
Which of the following steps are required to create a measuring point for performance-based preventive maintenance? (Choose two)
A. Specify the annual estimated usage for the measuring point.
B. Activate the Nleasurement Reading Transfer indicator.
C. Define a valuation code group.
D. Create the measuring point as a counter.
In Customizing, to what data must you assign digital signatures in addition to the order type?
A. Maintenance plant
B. Work center
C. Maintenance planner group
D. Planning plant
Your customer wants to utilize estimated costs in Plant Maintenance orders. Which condition does the customer need to be aware of?
A. Planned costs overwrite estimated costs after release of the order.
B. A specific order type in which cost estimates are activated must be used.
C. Planned costs must not exceed the estimated costs.
D. Upon release of the order, estimated costs cannot be revised.
When is the latest possible point in time that you can create a settlement rule?
A. Before technical completion
B. Before order release
C. After order release
D. After technical completion
Which steps must you perform to enable the valuation of characteristics for a piece of equipment? (Choose three)
A. Assign characteristics to the equipment class type.
B. Assign characteristics to a class.
C. Create characteristics in the classification system.
D. Assign a class to a piece of equipment.
E. Assign a class to the equipment category.
You want to record changes to equipment master data fields in the usage history. For which of the following objects can you activate the usage history? Please choose the correct answer. Response:
A. Equipment class
B. Equipment category
C. Object type
D. Planning plant
Response:
A. To uniquely identify inventory material items
B. To have a future option to track material items as pieces of functional locations
C. To have a future option to track material items as pieces of equipment
D. To have the option to track batches
Which statements apply to a client in an SAP system?
Choose the correct answer(s).
Response:
A. In business terms, the client is a completely independent unit.
B. Each client has their own database.
C. A client corresponds to a customer.
D. A client can represent the mapping for an entire enterprise.