Certbus > IBM > IBM Certifications > C1000-031 > C1000-031 Online Practice Questions and Answers

C1000-031 Online Practice Questions and Answers

Questions 4

A customer has a significant investment in open source software for performing in-memory analytics. This workload is currently deployed on Linux and recent x86 hardware.

What advantage would a POWER9 processor-based server provide this customer?

A. Faster ChipKill correction rate

B. More cache per core

C. More cores per socket

D. Faster PCIe bandwidth

Browse 101 Q&As
Questions 5

Which component of PowerSC monitors AIX systems, maintains security, and provides alerts when a change to the system violates a configuration policy?

A. Trusted Logging

B. Real Time Compliance

C. Security and Compliance Automation

D. Trusted Surveyor

Browse 101 Q&As
Questions 6

A customer has ordered a Power System E980. The system has been built, but cannot be shipped.

What would prevent the system from being shipped?

A. The mandatory pre-install TDA has not been completed.

B. The IBM System Support representative has not completed the pre-install site visit.

C. The opportunity owner has not released it.

D. A pre-sale TDA discovered correctable issues that have not been corrected.

Browse 101 Q&As
Questions 7

Which capability is used to reallocate memory from one LPAR to another?

A. Live Partition Mobility

B. Active Memory Expansion

C. Dynamic Logical Partitioning

D. Active Memory Sharing

Browse 101 Q&As
Questions 8

A customer with a Power System 770 and direct SAN I/O is planning a migration to a Power System E980. The Power System 770 has four 8Gb PCIe 2-port full-height Fibre Channel adapters with all storage going through the SAN. The customer wants to keep the same WWPNs, and avoid a SAN reconfiguration.

What procedure should be recommended?

A. Order new HBAs, but keep using the existing, already configured SAN switches.

B. Order a PCIe Gen3 I/O Expansion Drawer and relocate the HBAs into the drawer.

C. Order new HBAs and modify the WWPNs in the ASMI.

D. Move the HBAs from the Power 770 and install them into the Power System E980 system node.

Browse 101 Q&As
Questions 9

An IBM Power System E980 customer is allocating six processor cores to a shared processor pool where they intend to create four partitions as defined below: An IBM i partition with 1.75 processing units and 2 virtual processors ?uncapped An IBM i partition with .60 processing units and 1 virtual processors ?uncapped An IBM i partition with .40 processing units and 1 virtual processors ?uncapped A VIOS partition with 1.25 processing units and 2 virtual processors ?uncapped

How many IBM i licenses are required to support this configuration?

A. 2.75

B. 6.0

C. 4.0

D. 2.0

Browse 101 Q&As
Questions 10

A customer needs to run a Linux database application that is supported on both x86 and Power System processors.

What is the advantage of selecting a POWER9 processor-based system for this application?

A. The ability to move live workloads without downtime.

B. More applications are compiled for Power Systems than for x86.

C. Better memory bandwidth on POWER9 processor-based systems.

D. More cores per socket on POWER9 processor-based systems.

Browse 101 Q&As
Questions 11

An existing POWER8 client is requesting redundant hardware, service, and basic virtualization management for their new POWER9 Enterprise server. Their Systems Architect has included one 7063CR1.

Which of the following provides redundancy?

A. An existing 7042-CR8 with firmware at V8.

B. An Integrated Virtualization Manager (IVM).

C. An existing 7042-CR6 with firmware upgraded to V9.

D. An HMC Virtual Appliance

Browse 101 Q&As
Questions 12

What would improve overall utilization of physical memory resources by allowing a group partitions to use a pool of physical memory resources?

A. Active Memory Sharing

B. Active Memory Expansion

C. Active Memory Mirroring

D. Active Memory Deduplication

Browse 101 Q&As
Questions 13

What is the minimum amount of rack space that an 80 core Power System E980, without any I/O drawers, will take up in a 19 inch rack?

A. 10U

B. 12U

C. 16U

D. 8U

Browse 101 Q&As
Questions 14

Which open source technology forms the basis for PowerVC?

A. Linux

B. KVM

C. Hadoop

D. OpenStack

Browse 101 Q&As
Questions 15

A customer's infrastructure is currently based on a Power System E870 managed by an HMC 7042-CR6 at V8.860 SW level. They are planning to upgrade their server to a new Power System E980.

Which of the following will enable the customer to connect an HMC to the Power System E980?

A. Install vHMC on a partition on the Power System E980.

B. Order a new Power-based HMC (7063-CR1).

C. Upgrade the software on the existing HMC.

D. Use the existing HMC at the current SW level.

Browse 101 Q&As
Questions 16

A customer has a mission-critical IBM i application running on a POWER9 processor-based server that requires eight processor licenses. For High Availability, a POWER9 CBU server is synchronized with the production server using PowerHA for IBM i.

What is the minimum number of IBM i processor licenses required on the CBU server?

A. 2

B. 4

C. 1

D. 8

Browse 101 Q&As
Questions 17

Which of the following is a feature exclusive to PowerVM Enterprise Edition?

A. PowerVC

B. PowerSC

C. Active Memory Sharing

D. HMC Virtual Appliance

Browse 101 Q&As
Questions 18

A Technical Delivery Assessment (TDA), as part of the Solution Assurance is used to:

A. aggressively complete against competition.

B. resolve concerns about customer satisfaction.

C. expedite shipment of a server.

D. identify and assess risks.

Browse 101 Q&As
Exam Code: C1000-031
Exam Name: IBM Power Systems Scale-Up Technical Sales
Last Update: Mar 15, 2025
Questions: 101 Q&As

PDF

$49.99

VCE

$55.99

PDF + VCE

$65.99