You plan to migrate an SAP ERP Central Component (SAP ECC) production system to Azure.
You are reviewing the SAP EarlyWatch Alert report for the system.
You need to recommend sizes for the Azure virtual machines that will host the system.
Which two sections of the report should you review? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
A. Hardware Capacity
B. Patch Levels under SAP Software Configuration
C. Hardware Configuration under Landscape
D. Database and ABAP Load Optimization
E. Data Volume Management
You have an SAP ERP Central Component (SAP ECQ) environment on Azure. You need to add an additional SAP application server to meet the following requirements:
1.
Provide the highest availability.
2.
Provide the fastest speed between the new server and the database. What should you do?
A. Place the new server in a different Azure Availability Zone than the database.
B. Place the new server in the same Azure Availability Set as the database and the other application servers.
C. Place the new server in the same Azure Availability Zone as the database and the other application servers.
You have an existing SAP production landscape that uses SAP HANA databases.
You plan to migrate the landscape to Azure.
Which Azure virtual machine series will be Azure supported for the production SAP HANA database deployment?
A. F-Series
B. A-Series
C. M-Series
D. N-Series
You deploy an SAP environment on Azure.
You need to ensure that incoming requests are distributed evenly across the application servers.
What should you use?
A. SAP Web Dispatcher
B. SAP Solution Manager
C. SAP Control
D. Azure Monitor
You have an SAP landscape on Azure that contains the virtual machines shown in the following table.
You need to ensure that the Application Server role is available if a single Azure datacenter fails. What should you include in the solution?
A. Azure Private Link
B. Azure Load Balancer Standard
C. a local network gateway
D. Azure Application Gateway v1
HOTSPOT
For each of the following statements, select yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.
Hot Area:
HOTSPOT
You are planning the deployment of a three-tier SAP landscape on Azure that will use SAP HANA. The solution must meet the following requirements:
1.
Network latency between SAP NetWeaver and HANA must be minimized.
2.
An SAP production landscape on Azure must be supported.
3.
Network performance must be validated regularly.
What should you include in the solution? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:
HOTSPOT
For each of the following statements, select yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.
Hot Area: