Details for the QM specific procurement processes at plant level are determined using the QM control key.
A. Incorrect
B. Correct
Which statements are correct? (More than one answer is true.)
A. The certificate can be transferred as a PDF file.
B. You can monitor the receipt of a quality certificate with and without inspection lot processing, independently of the time of goods receipt.
C. You can electronically send and receive quality certificates for a delivery.
D. You can make it possible for your customers to access quality certificates on the Internet.
These are prerequisites to inspection lot creation: The inspection type is active in the material master
QM is active in the table of movement types
A. Incorrect
B. Correct
You cannot control inspection lot creation (lot combination) using he inspection type in the material master.
A. Incorrect
B. Correct
Which statements are correct? (More than one answer is true.)
A. You use control charts to control or monitor one or more processes. In the task list characteristics, you use the SPC criterion to define these processes are to be combined or separated from one another (which inspection lots refer to a common control chart).
B. The SPC criterion controls how processes are combined or separated for a control chart (that is which inspection lots refer to a common control chart).
C. You make the preparations for a control chart in the sampling procedure and the task list or master inspection characteristic.
D. You cannot use the control chart to valuate inspection results. If an appropriate valuation rule is used, a sample can be rejected if at least one of the action limits in the related control chart is exceeded.
Which are belongs to Quality Inspection, Activities? (More than one answer is true.)
A. Results recording
B. Inspection planning functions
C. Works test certificate
D. Inspection lot processing
E. Defects recording
Flexible inspection specifications are to be used where inspections can be fully planned in advance.
A. Incorrect
B. Correct
The certificate type determines (more than one answer is true):
A. Whether a certificate is needed for each purchase order item
B. How the system reacts if the certificate is not available at goods receipt
C. Whether a certificate is needed for each goods receipt
D. All are false
The standard workflow processes in the notifications area are always active.
A. Incorrect
B. Correct
The following standard analyses are available in the QM Information System.
A. Inspection lots
B. Inspection Groups
C. Notification overview
D. Inspection results
E. Problems in notifications
Which statements are correct? (More than one answer is true.)
A. You cannot record costs and track capacity load utilization in the order.
B. You can use a relevant follow-up actions to change the equipment status.
C. You can record results for each item of test equipment (by unit to be inspected).
D. You can also run control charts for equipment or functional locations.
If no alternative unit of measure is entered in the material, input help appears for the quantity fields on the stock screen.
A. Incorrect
B. Correct
The partner type defines the master record (debtor, creditor, organizational unit, position, SAP user and personal number) that underlies the partner function.
A. Incorrect
B. Correct
When you assign the inspection methods to the master inspection characteristics, only inspection methods with a validity date that corresponds to the master inspection characteristic are proposed.
A. Incorrect
B. Correct
You can use a reference operation set as a copy model for creating new inspection plans.
A. Correct
B. Incorrect