On which three entities can proration be disabled? (Choose three.)
A. Calculation Rule Business Object
B. Bill Factor
C. Calculation Rule
D. Rate Version Calculation Group
E. Rate Schedule
Your client has the following requirements:
Many customers are installing their own solar electrical generation equipment. When these customers generate more electricity than required for their own use, the surplus can he exported back to the power grid.
In order to measure this generation, we have installed special scalar devices. These devices have separate registers to measure the energy generated (export) and the energy received (import) from the National Grid. Both reads will be stored in kWh, but the import is subtractive and export is consumptive.
What solution should you choose to configure the measuring component types for these specific requirements?
A. Create two service points: one for subtractive import and the other for consumptive export.
B. Create one new measuring component type for creating two measuring components (one for import and the other for export) that will be linked to one scalar device.
C. Create one new measuring component type for creating a new measuring component that will be linked to two different scalar devices (one for import and the other for export).
D. Create two new measuring component types (one for subtractive import and the other for consumptive export) to enable the creation of two measuring components that will be linked to one scalar device.
How do you ensure that specific Validation, Editing, and Estimation (VEE) rules are applied to estimated measurements?
A. by adding the VEE Group to the Device Configuration Type
B. by adding the estimation rules to the Manual Override VEE Group to the Measuring Component Type
C. by adding the VEE Group to the Device Type
D. by adding the VEE Group as the Fallback VEE Group for the appropriate VEE role
For a customer to receive a Subscription communication, what must they have?
A. an active address contact preference
B. an active address type preference
C. an active person contact preference
D. an active account contact preference
Throughout its lifecycle, an asset's disposition changes as it is moved between locations and service statuses.
Which are valid asset dispositions?
A. Receiving; Installed; Storage; Retired
B. In Receipt; In Field; In Stores; Retired
C. In Receipt; Installed; In Stores; Retired
D. Receiving; In Field; Storage; Retired
What contains the details of how a bill was calculated and how it will be printed on a bill?
A. Calculation Rules
B. Rate Schedule
C. Service Agreement
D. Bill Segments
E. Bill
Which three statements are true about the different types of measuring components? (Choose three.)
A. Seconds-per-interval (SPI) is one of the attributes of scalar measuring components.
B. Only physical measuring components reference a device configuration.
C. The terms register and channel are synonyms for measuring component.
D. The measuring component types are physical, standalone, scratchpad, and TOU.
E. Scalar measuring components contain a single measurement for an arbitrary period of time.
What can cause multiple bill lines for a rate component to be produced in a bill calculation header?
A. changes in Rate Schedule and Bill Factor
B. changes in Rate Version Calculation Group and Bill Factor
C. change in Bill Factor
D. change in Rate Version Calculation Group
E. change in Rate Schedule
Which three statements are true about initial measurements, final measurements, and usage? (Choose three.)
A. Usage is a synonym for bill determinants.
B. The initial measurement data can be optionally stored in Raw format.
C. A service point can have more than one initial measurement for the same period, but only one final measurement.
D. Final measurements can be directly edited or updated by users or by automated processes as required.
E. Usage is loaded in the application to generate final measurements.
Usage transactions can contain date breaks. Which is used to supply date breaks?
A. the Deferred Monitor Calculation Algorithm
B. the Usage Subscription Type
C. the requesting system or user input
D. the Usage Subscription BO
Which two are "Are SP and Device Ready?" state algorithms for Enable Service? (Choose two.)
A. Customer Device Compatibility Check
B. Create Service Point
C. Check for Measurement
D. Create Usage Subscription
E. Start Service Agreement
What correctly describes the order in which algorithms, if plugged in, are executed when a bill changes from the "Pending" state to the "Complete" state?
A. Service Agreement Type - Pre-Bill Completion; Service Agreement Type - Bill Completion; Customer Class - Pre-Bill Completion; Customer Class - Bill Completion; Customer Class - Post-Bill Completion
B. Customer Class - Pre-Bill Completion; Customer Class - Bill Completion; Service Agreement Type Pre-Bill Completion; Service Agreement Type - Post-Bill Completion
C. Customer Class - Pre-Bill Completion; Service Agreement Type - Pre-Bill Completion; Customer Class
- Bill Completion; Service Agreement Type - Bill Completion; Customer Class - Post-Bill Completion
D. Service Agreement Type - Pre-Bill Completion; Customer Class - Pre-Bill Completion; Service Agreement Type - Bill Completion; Customer Class - Bill Completion; Customer Class - Post-Bill Completion
E. Service Agreement Type - Pre-Bill Completion; Customer Class - Pre-Bill Completion; Service Agreement Type - Bill Completion; Customer Class - Bill Completion; Service Agreement Type - Post-Bill Completion; Customer Class - Post- Bill Completion
Your client has three requirements:
1.
Apply validations on meter reads coming from the Data Collectors.
2.
If a meter read does not pass the validation, an error will be generated and assigned to a user.
3.
Retry the validation every 30 minutes for the errors in case the issue is related to configuration. Which statement describes the base functions you should use?
A. If a To Do entry is created on the VEE exception, the IMD's Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-COMP-TD (Complete To Do Entries).
B. If a To Do entry is created on the VEE exception, the IMD's Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-IMD-RETRY (Retry Initial Measurement Data Processing)
C. If a To Do entry is created on the VEE exception, the user will need to discard the IMD and a new IMD will be loaded after 30 minutes.
D. If a To Do entry is created on the VEE exception, the IMD's Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-CRE-IMDTD (Create To Do)
E. If a To Do entry is created on the VEE exception, the user will need to discard the IMD and a new IMD will be manually loaded.
A device has one or more measuring components that measure consumption, demand, or other values.
Which lists two attributes of a measuring component?
A. Channel Multiplier and Channel ID
B. Channel ID and Badge Number
C. Serial Number and Badge Number
D. Model and Serial Number
E. Manufacturer and Model
At what stage in the initial measurement data (IMD) import process will the application of meter multipliers be performed?
A. Critical Validation
B. VEE
C. Prepare for VEE
D. post-VEE